You are here:: CR+ EXPERIENCE
Ensuring the highest professional standards are maintained as set out in the following CR Plus Policy Statements. These are fully adopted into our working practices and continually reviewed:
Increasing furnace speed by up to 70% Reducing furnace specific energy costs by up to 65% Improving drier performance enabling speed & output increases Rationalising two factories into one with savings in excess of £2.5M per year Capital survey to improve production rate at a Nickel Refinery Chemical plant investigation to provide production increase 33kV to 11kV supply conversion project saving £900k per year Monitoring & Targeting implementation in various industrial sectors Reduced maintenance by correctly designed pumping arrangements Improving efficiency on thermal and catalytic oxidisers Environmental waste reduction in whey processing Implementation of new SCADA and other control techniques Process modelling to determine a process flow change