CR Plus Ltd

Tel: 0845 070 3880 Fax: 0845 070 3881



We are Committed to:

Ensuring the highest professional standards are maintained as set out in the following CR Plus Policy Statements. These are fully adopted into our working practices and continually reviewed:

  • Health and Safety
  • Quality
  • Environmental
  • IT

Useful Links

CR PLUS LTD


Our personnel have previously undertaken and succesfully implemented projects such as:


  • Increasing furnace speed by up to 70%
  • Reducing furnace specific energy costs by up to 65%
  • Improving drier performance enabling speed & output increases
  • Rationalising two factories into one with savings in excess of £2.5M per year
  • Capital survey to improve production rate at a Nickel Refinery
  • Chemical plant investigation to provide production increase
  • 33kV to 11kV supply conversion project saving £900k per year
  • Monitoring & Targeting implementation in various industrial sectors
  • Reduced maintenance by correctly designed pumping arrangements
  • Improving efficiency on thermal and catalytic oxidisers
  • Environmental waste reduction in whey processing
  • Implementation of new SCADA and other control techniques
  • Process modelling to determine a process flow change